What retrofit programmes measure and where the gaps remain
Retrofit outcome measurement helps us understand whether home improvements achieve their intended results. Counting installations tells us how much work a programme delivers. However, it does not explain how homes perform afterwards or what changes for residents.
Measuring for success? examines the measurement requirements of major retrofit programmes across England, Scotland and Wales. Published in October 2025, the report provides a baseline for understanding what programmes measured or estimated at that time.
Why did NRH undertake this review?
NRH’s 2024 Retrofit Delivery: State of the Nation Review identified challenges across the retrofit system, including workforce development and EPC reform. It also highlighted the need for clearer public messaging.
One finding prompted our Measuring Outcomes & Impact Evaluation project: the need to identify and measure retrofit outcomes more effectively.
The available data did not give a full picture of what retrofit achieved, including its public health impacts. This led us to ask:
How can broader outcome measurement accelerate retrofit delivery and improve decisions about policy and funding? How can it help maximise benefits such as health and equity when resources are limited?
What does the report compare?
The review examines programme objectives alongside the information schemes require delivery organisations to collect and report. It distinguishes between directly recorded information and estimates based on modelling. It also identifies data gaps and assumptions that affect our understanding of results.
The report draws mainly on policy documents and programme specifications. Therefore, it describes requirements on paper rather than providing a complete account of delivery in practice.
What did the review find?
Programmes often rely on modelled savings. Many schemes reviewed estimated energy and carbon savings using EPC-based calculations rather than measuring performance in use.
Wider outcomes receive less consistent attention. Programmes often included ambitions for residents’ wellbeing or local employment, but did not systematically measure these benefits.
Some approaches offer opportunities for shared learning. For example, the review identified the Welsh Optimised Retrofit Programme’s detailed sensor monitoring as a useful example of collecting performance data.
Better evidence can reveal gaps between expectations and results. Combining building measurements with residents’ experiences can help organisations understand what improvements achieve.
Who is this report for?
The report supports people designing or evaluating retrofit programmes. It is relevant to policymakers and funders, as well as housing providers and local delivery teams.
Use it to question whether your reporting captures the outcomes your programme aims to achieve. It can also help inform discussions about proportionate monitoring and gaps in the available evidence.
Read Measuring for success?
Download the report to explore the programme comparisons and key findings.
This is an October 2025 baseline review. Scheme details and reporting requirements reflect the documents examined at the time, so check current official guidance before using them to plan delivery.
Take a look at the resource below, or read more about our Measuring Outcomes & Impact Evaluation project here.
Using the review in your work
Start with your programme’s intended outcomes. Then compare those aims with the information you collect.
For example, an installation record confirms that work took place. However, it does not establish whether residents feel more comfortable afterwards. Consider what additional evidence would help answer that question.
Agree your evaluation approach early so you can gather relevant information before work begins. Keep monitoring proportionate to the programme and explain to residents how you will use their feedback.
Read the full report
The full text of the report, programme by programme.
Introduction
Across the UK, retrofit activity is increasing but our ability to understand and measure its real impact remains limited. Most programmes collect basic delivery data, such as the number of measures installed or improvements in EPC ratings. Far fewer consistently capture what really matters: how retrofit is performing in use, and the difference it makes for people, places and policy goals.
This work builds on the National Retrofit Hub’s 2024 report, Retrofit Delivery: State of the Nation Review. That analysis identified several system-wide challenges, including the need for stronger jobs and skills pipelines, EPC reform, and clearer public messaging, alongside a clear gap in how retrofit outcomes are identified and measured. This gap forms the basis of the current project.
The central question guiding this work is: “How can broader outcome measurement accelerate retrofit delivery and be designed to drive better policy, funding and delivery decisions, particularly to maximise co-benefits such as health and equity in a fiscally constrained environment?”
Without credible and consistent outcome measurement, it’s difficult to shape effective policy, design funding programmes, or target delivery where it is most needed. Better data is essential to ensure retrofit delivers on its promises of reducing carbon emissions, improving comfort and health, tackling fuel poverty, and supporting local economies.
This paper sets out a baseline of what is currently being measured (and what is not) across major retrofit schemes in England, Scotland and Wales. The analysis draws mainly on policy and programme documentation, recognising that delivery in practice may differ from what is set out on paper. Alongside this, we are engaging with those designing, delivering and receiving retrofit programmes to understand how measurement plays out on the ground.
The next phase of this work will look ahead, asking: “What cultural, technical and policy conditions are needed to enable outcome-driven retrofit at scale and what actions can be taken now to move towards that vision?”
The findings provide a clear starting point for a wider conversation about how the UK can build a more robust and consistent approach to outcomes and impact evaluation.
Key takeaways from comparison
Most schemes report energy/bill/carbon savings through modelling based on EPC/SAP/Rd-SAP, not in-use performance. This presents an opportunity to develop this work to showcase some best practice examples that demonstrate real-world, in-use performance outcomes.
Non-energy outcomes (health, comfort, jobs, supply chain) are often aspirational targets but rarely systematically measured. With growing policy and funding interest in the health benefits of retrofit, many local authorities are keen to explore this area, creating space to expand evidence and surface innovation.
Optimised Retrofit Programme stands out for using detailed sensor-based monitoring, of-fering robust post-installation data. This presents an opportunity for further learning and knowledge sharing across the sector.
Over-reliance on EPC modelling risks masking performance gaps and misrepresenting actual impacts. Current calls for EPC reform are particularly timely, aligning with broader policy goals to work towards ensuring more accurate and accountable performance measurement.
Definitions
Targets: the goals and performance outcomes that funded projects must achieve to improve the energy efficiency of homes. These targets can range across programmes, often tied to both environmental and social objectives, including reducing carbon emissions, tackling fuel poverty, and improving living conditions. Measured: directly recorded during project delivery as they form the basis for grant claims and performance monitoring. Reported (not directly measured): impacts that are estimated or modelled using tools or statistical analysis. Data Gaps & Assumptions: The underlying data limitations, informing in part the NRH development of policy recommendations for more robust outcomes identification and measurement.
Energy Company Obligation 4 (ECO4)
A UK-wide scheme placing obligations on major energy companies to deliver energy savings via a credit system. These are passed on to contractors who must deliver these savings through retrofit measures to low-income owner occupier or privately renting households. ECO4 will finish in March 2026.
Targeted
- Fuel poverty reduction
- Carbon reduction
- Support for vulnerable customers
- Market stimulation
Measured
- Measures installed (number & type)
- Homes upgraded (incl. tenure)
- EPC improvement (SAP/RdSAP), Floor area
- Perceived bill savings (survey)
Reported (not directly measured)
- Energy, bill, and carbon savings (from Ofgem scores)
- Surveys & anecdotal sources: private investment stimulation, comfort/wellbeing, behaviour change, supply chain, job creation
Data gaps and assumptions
- Heavy reliance on SAP/RdSAP
- Many non-energy impacts are anecdotal
References
Home Energy Upgrade Grant (HUG) & Local Authority Delivery (LAD)
LAD and HUG devolve funding for retrofit to local authorities in England, who then target low-income owner occupier or privately renting households in their area. While LAD targets EPC ratings of E, F or G, HUG targets off the gas grid homes between D and G. Schemes now closed and superseded by WH:LG.
Targeted
- Reduced bills
- Carbon reduction
- Energy efficiency
Measured
- Measures installed (number & type)
- Homes upgraded (including tenure & region)
- Pre/post EPC scores
Reported (not directly measured)
- Energy, bill, and carbon savings (modelled via data collected on measures installed and National Housing Model)
Data gaps and assumptions
- No real-time or performance data
- Model-based outcomes
References
Warm Homes: Local Grant (WH:LG)
Like LAD and HUG, WH:LG devolves funding to Local Authorities in England, who then target low-income owner occupier or privately renting households in their area.
Targeted
- Fuel poverty
- Reduced bills
- Carbon reduction
Measured
- Measures installed (number & type)
- Homes upgraded
- Pre/post EPC
- Trustmark lodgment
Reported (not directly measured)
- Assume modelled energy, bill, and carbon savings
Data gaps and assumptions
- Similar to HUG/LAD – EPC-driven modelling only
References
- WH:LG Policy Guidance
- WH:LG MoU
SDHF Wave 2.1 & 2.2
A competition-based scheme, where social housing landlords in England apply for funding to improve the energy and carbon performance of social housing. The primary focus of the scheme is to raise the EPC EER rating of homes to band C. Successful projects were announced in February 2024, and these projects are currently being delivered.
Targeted
- Fuel poverty
- Carbon savings
- Tenant wellbeing
- Green jobs
- Supply chain growth
Measured
- Measures installed (number & type)
- Homes upgraded
- Partial EPC pre/post
- PAS data
- Additional chosen by grant recipients
- Some independent research commissioned
Reported (not directly measured)
- Modelled energy, bill, and carbon savings
Data gaps and assumptions
- Lacks uniform measurement of non-energy outcomes (supply chain growth, jobs, wellbeing)
References
Warm Homes: Social Housing Fund Wave 3 (WH:SHF)
The next wave of social housing funding, with some updates including the addition of the Challenge Fund approach (all applications that meet the minimum requirements of the scheme awarded funding) and Strategic Partnerships (providing greater autonomy and flexibility for organisations with proven track records). Successful projects were announced in March 2025, and delivery of these projects will run to September 2028.
Targeted
- Same as Wave 2
Measured
- Measures installed (number & type)
- Homes upgraded
- Pre/post EPC
- Landlord capacity/capability data
- Supply chain growth
- Resident experience
- Additional chosen by grant recipients
Reported (not directly measured)
- Modelled energy use and carbon savings
- Capacity, supply chain, resident experience
Data gaps and assumptions
- Effectiveness of capacity/supply chain measurement to be determined
References
Welsh Government Warm Homes Nest
A demand-led scheme providing support and improvements to low-income and vulnerable owner occupier or privately renting households in Wales since 2011.
Targeted
- Fuel poverty
- Energy efficiency
- Economic development
- Climate change
- Net Zero
Measured
- Measures installed (number & type)
- Homes upgraded
- Pre/post SAP
- Advice/support numbers Eligibility referrals
- Household satisfaction
- Partnerships/events /training
- Campaigns delivered with LAs
- Community benefits
Reported (not directly measured)
- RdSAP modelled reductions in energy use/ cost
- Estimated social benefit from householder profile & support data
Data gaps and assumptions
- Some broader social data collected, but energy savings still SAP-modelled
References
Welsh Optimised Retrofit Programme (ORP)
A scheme funding Registered Social Landlords (RSLs) and local authorities (LAs) to install a variety of home decarbonisation measures in existing social housing stock, and to support the achievement of the WHQS. Phase 3 is currently open to applications and delivering projects.
Targeted
- Affordable warmth
- Decarbonisation
- Best delivery path for each home
Measured
- Air tightness
- Skills & supply chain development
- Detailed sensor monitoring pre & post retrofit: primary energy, gas & elec import export, temps, humidity, CO₂
- Sub-metering of systems: heating, hot water, ventilation, PV, battery & EV
Reported (not directly measured)
- N/A
Data gaps and assumptions
- One of few schemes using actual in-use performance data
References
Welsh Housing Quality Standard 2023 (WHQS)
The WHQS sets requirements for social rented homes, including that they are “affordable to heat and have minimal environmental impact.” The Welsh Government then allocates funding to local authorities and housing associations to enable them to meet the standard.
Targeted
- Good condition
- Safety
- Affordability
- Minimal environmental impact
Measured
- Pass/fail on standard items
- SAP rating
- Hazard scores
- % stock meeting standard
Reported (not directly measured)
- N/A
Data gaps and assumptions
- SAP as main energy/affordability proxy
References
Warmer Homes Scotland
Fuel poverty scheme providing support and improvements to low-income owner occupier or privately renting households in Scotland since 2015.
Targeted
- Fuel poverty
- Carbon reduction
- Good value for money
- Improving Scotland’s housing stock
- Community benefits
Measured
- Measures installed (number & type)
- Homes upgraded
- Pre/post EPC
- Support provided
- Training/jobs
- Additional funding/loans leveraged
- Household satisfaction
Reported (not directly measured)
- Modelled energy cost /carbon savings
Data gaps and assumptions
- EPC-driven modelling; community benefits not quantified in energy terms
References
Scottish Government’s Area Based Schemes (ABS)
Launched by the Scottish Government in 2013, ABS devolves funding to local authorities, who deliver with partners and energy companies, targeting high fuel poverty areas and the least energy-efficient properties. The aim is to enable upgrades across tenures, however social housing is not eligible for funding from the scheme – registered providers need to access funding from other sources.
Targeted
- Fuel poverty
- Carbon reduction
- Energy efficiency
- Warmth & comfort
Measured
- Measures installed (number & type)
- Councils may measure EPC change, bill savings, indoor temp/humidity
Reported (not directly measured)
- Varies by LA
Data gaps and assumptions
- Highly variable measurement approach; often minimal beyond EPC
References
Scottish Social Housing Net Zero Heat Fund (SHNZHF)
Provides capital grant funding to registered social landlords (RSLs) and local authorities to retrofit existing housing stock with zero direct emission heating systems and energy efficiency measures. It supports Scotland’s legally binding target of net zero emissions by 2045 and statutory fuel poverty goals. The fund operates under two themes: Clean Heating Systems (retrofit projects installing zero-emission heating) and Fabric First (energy efficiency-only projects). Funding covers up to 60% of capital costs for heating systems and up to 50% for energy efficiency measures, with grant caps of £5 million per project and £35,000 per property (uplifts available for rural areas). Projects must meet mandatory criteria and be completed within the financial year of award.
Targeted
- Fuel poverty
- Net zero
Measured
- Cap ex costs
- Measures installed (number & type)
- Homes upgraded
- Performance data: energy, emissions, heating system efficiency
- Tenant outcomes: comfort, affordability, satisfaction
- Skills & capacity within supply chain and RSLs
Reported (not directly measured)
- Ability to attract investment
- Ease of deployment
- Scale of decarbonisation
- Expertise growth
Data gaps and assumptions
- Mix of measured and qualitative criteria
References
Passivhaus Enerphit
A voluntary retrofit standard, representing high levels of verified performance. Compliance can either be demonstrated via the ‘component method’ or the ‘energy demand method’.
Targeted
- Carbon reduction
- Comfort, health & wellbeing
- Quality
- Cost reduction
Measured
- Airtightness
- Ventilation flow rates
Reported (not directly measured)
- PHPP Modelled:
- Heating/cooling demand
- Space heating EUI
- Primary Energy
- Renewables generation
- Overheating frequency
Data gaps and assumptions
- Combines measured QA with robust modelling
References
Frequently asked questions
What is retrofit outcome measurement?
Retrofit outcome measurement assesses the changes that follow improvements to existing homes. It considers building performance alongside residents’ experiences to understand whether the work achieves its intended benefits.
What is the difference between measured and modelled results?
Measured results use observations or recorded data, such as energy consumption. Modelled results estimate performance using calculations and assumptions. Both provide useful information, but estimates do not confirm what happened in a particular home.
Does this report assess delivery in practice?
The review mainly examines policy documents and programme specifications. It compares their measurement requirements and identifies gaps. Delivery organisations can undertake additional monitoring that those documents do not capture.
Are the programme details still current?
The report provides a baseline published in October 2025. Programme rules and funding arrangements can change. Check the latest official scheme guidance before relying on individual requirements.
Explore approaches to measurement
For examples of measurement methods and frameworks, explore our Measuring Outcomes & Impact Evaluation: Innovator Profiles.
Find related research through our Measuring Outcomes & Impact Evaluation project.